Nova Underground
PPE Program & Hazard Assessment
Document NU-SAF-102

NU-SAF-102 — PPE PROGRAM & WRITTEN HAZARD ASSESSMENT

Tier 2/3/4 — Procedure + Field Card + Hazard Assessment Certification · Rev 1.0 DRAFT — goes live the day Adam signs §5 · Owner: Field Supervisor Parent: NU-SAF-100 §5 element 3. Governing standards: 29 CFR 1926 Subpart E (1926.95–.106) for the equipment; 29 CFR 1910.132(d)(2) for the written certification (§1 explains why both). Field-card layer: Card 05-A line 8 is the daily gate; NU-SAF-102-C (§7) is the truck card. This document is the program behind both.


THE GATE

The baseline five — hard hat · hi-vis · safety glasses · safety-toe boots · gloves — go on before the gate at the yard and stay on inside the cones. Every man, every site, every day (Card 05-A line 8). The task add-ons in the §4 table go on before the task starts, not after the first close call. And the program itself has one record that matters: the signed certification in §5. Unsigned, Nova has no PPE program on the day an auditor asks.

Two records back this gate. Daily: the Card 05-A morning gate plus the PPE line on the JSA (the form the Work Order Ready Gate labels JHA — same form). Program: the signed §5 certification, filed where the office can produce it in under a minute.


1. WHY TWO STANDARDS ARE CITED (read this before an audit, not during one)

Why it matters beyond audits: the assessment is the one page that says, task by task, what a Nova hand wears before he starts. A new hire shouldn't have to learn that from a burn or a chipped tooth.


2. THE BASELINE FIVE

Card 05-A line 8, quoted exactly, because the field card and this program must never drift apart:

PPE on before the gate: hard hat · hi-vis · safety glasses · safety-toe boots · gloves.

That line is the whole daily standard. What each item means:

Item The standard Cite
Hard hat Worn wherever there is possible danger of head injury from impact, falling or flying objects, or electrical contact — which is every Nova work area. Not backwards under a bore rig mast, not riding the dashboard. 1926.100(a)
Hi-vis Class per road exposure, per NU-SAF-105 §6.3: Class 2 minimum, all workers, all sites, always. Class 3 for night work, anything above 45 mph, and every flagger. NU-SAF-105 owns the class rules — this row just makes hi-vis one of the five. NU-SAF-105 §6.3 · 1926.201(a) (flaggers)
Safety glasses On from the gate, not from the first spark. Machines, mud, marking paint, and stone chips do not announce themselves. Men who wear prescription glasses get over-the-glass (OTG) safety glasses or prescription safety eyewear — Nova stocks OTG as the default (1926.102(a)(2)). Street glasses are not safety glasses. 1926.102(a)(1) · 1926.102(a)(2)
Safety-toe boots Protective footwear meeting the consensus standard, every man below the neck of the excavation trade's number-one crush zone: his own feet. 1926.96
Gloves Construction carries no numbered glove standard — hand protection rides on the general provision (1926.95(a); 1910.138 is the general-industry analog). Nova's rule is simpler: gloves on for every hands-on task. Rod handling, rigging, lids, pipe, tools. 1926.95(a)

The five are the floor, not the ceiling. §4 adds task PPE on top. Nothing in §4 ever subtracts from the five.


3. TASK ADD-ONS (what goes on top of the five, and when)

Add-on When The standard
Dielectric gloves + insulating mat Operator, hands on the controls, every pilot bore. NU-SAF-110 §2 owns this gate and §2.1 owns the care rules (daily inspect + air test, 6-month electrical retest, leather protectors — 29 CFR 1926.97). Not restated here; go read it. NU-SAF-110 · 1926.97
Hearing protection In the rig zone whenever a drill rig, hydrovac blower, missile, or breaker is running, and any time you have to raise your voice at arm's length. Plugs or muffs — worn, not pocketed. A full hearing conservation program (monitoring, audiograms) is NU-SAF-113 — on the register gap list, not built; until it exists, the rule is: loud task = protection on. 1926.101 · 1926.52
Face shield over safety glasses Cutting, grinding, and sawcutting — asphalt, concrete, pipe, steel. The shield is add-on armor, not a substitute: glasses stay on underneath. Silica dust controls for sawcutting are NU-SAF-111's job (register gap list, not built) — flagged in §9 item 7. 1926.102(a)(1)
Waders / rubber boots Mud work — bore pits, hydrovac spoil, standing water, fluid returns. Wet feet in July are a nuisance; wet feet in January are the end of the workday. Safety-toe still applies where crush hazard exists — rubber safety-toe, not box-store rain boots. 1926.95(a)
Heat-resistant gloves Hands near the fusion heater plate — it runs hot enough to brand you through a work glove. [Adam: confirm heat-rated gloves are actually in the fusion kit — see §9] 1926.95(a)
Chemical-resistant gloves + splash goggles when the SDS calls for them Handling drilling-fluid additives, solvents and degreasers, fuel, pipe lube — anything with a warning label. The SDS says which glove; the HazCom program that houses the SDS binder is NU-SAF-101 (DRAFT 8/1/26, pending Adam sign-off — SDS binder rides each truck per its §4). 1926.95(a)

4. THE WRITTEN HAZARD ASSESSMENT — BY TASK (Tier 4 · NU-SAF-102-F)

This table IS the hazard assessment. The §5 block certifies it. Baseline five is assumed on every row — the columns list what the task adds and where the governing rules live. Re-assess per §5.2.

# Task Hazards found PPE beyond the five Governing docs
1 HDD drilling (rig zone) Rotating drill string, high-pressure fluid, pinch and crush at the vise, noise, mud splash, utility strike / energization Hearing protection in the rig zone. Operator on pilot: dielectric gloves + mat per NU-SAF-110 §2. Goggles over glasses when charging the hopper with bentonite or additives (dust) NU-SAF-110 · NU-FLD-220 · HDD Operator book Card 2
2 Locating Live traffic exposure, uneven ground, sun and heat None beyond the five — hi-vis class per road per NU-SAF-105 §6.3. Heat rules per NU-SAF-112 NU-SAF-105 · NU-SAF-112
3 Potholing / hand-dig / hydrovac High-pressure water and air, flying spoil and stone, blower noise, mud, buried utility contact Face shield over glasses on the wand. Hearing protection at the hydrovac. Waders/rubber boots in mud NU-FLD-200 ch. 4 · Day 1–2 book Cards 4 & 7
4 Mini-ex trenching Struck-by and swing radius, cave-in, spoil at the edge, noise Hearing protection when a breaker runs; otherwise none beyond the five — the controls are distance and spotters (NU-SAF-116 §4 exclusion zone) and protective systems (NU-SAF-107), not equipment on the body NU-SAF-107 · NU-SAF-116
5 Missile shots Pneumatic tool noise, air-hose whip, pit work, mud Hearing protection while the missile runs. Waders/rubber in wet pits NU-FLD-200
6 Traffic zones (all road work) Struck-by from live traffic — the one hazard that kills without touching a machine Hi-vis class stepped up per exposure: Class 3 night / above 45 mph / flaggers. All other rules are NU-SAF-105's NU-SAF-105 §§4–6
7 Fusion / couplers Contact burns from the heater plate, pinch at the clamps, solvent wipes Heat-resistant gloves at the plate. Chemical-resistant gloves for solvent wipe-down [Adam: fusion kit contents — confirm]
8 Loading / towing Crush and pinch at the hitch, strap recoil, dropped ramps and rod boxes, feet under steel None beyond the five — gloves and safety-toes are the working items; the controls are procedure and hands-out-of-the-bight per NU-FLT-310 NU-FLT-310
9 Vault / handhole work (topside only) Smashed fingers on lids, wet ground, and the hazard that owns its own SOP: the atmosphere below the lid Waders/rubber when wet. Lid work with a hook, not fingers. Entry PPE is not listed because entry is not permitted — NU-SAF-109 governs, and until its §9 program items close, nobody enters NU-SAF-109
10 Sawcutting / grinding / breaking pavement Flying fragments, blade contact, noise, silica dust Face shield over glasses. Hearing protection. Silica controls per NU-SAF-111 when built — until then, flag on the JSA [Adam: see §9] NU-SAF-111 (gap)

Chemicals on Nova trucks and rigs, assessed once here: bentonite and drilling-fluid additives, diesel/gasoline, hydraulic oil, engine oil and grease, pipe lube, marking paint, two-cycle mix, solvents/degreasers. Contact PPE per §3 last row; the SDS binder and labeling program is NU-SAF-101 (DRAFT 8/1/26, pending Adam sign-off — SDS binder rides each truck per its §4).


5. CERTIFICATION OF HAZARD ASSESSMENT (this signature is what the audit wants)

CERTIFICATION OF HAZARD ASSESSMENT — 29 CFR 1910.132(d)(2)

Workplace evaluated: Nova Underground field operations — all crews, all job sites, and the equipment yard; the tasks listed in §4 of this document (HDD drilling, locating, potholing/hand-dig/hydrovac, mini-ex trenching, missile shots, traffic zones, fusion/couplers, loading/towing, vault/handhole topside work, sawcutting/grinding). Finding: the hazards identified in §4 require the personal protective equipment listed in §§2–4 of this document. Person certifying that the evaluation has been performed: Adam Pelewski, Owner, Nova Underground. Date(s) of the hazard assessment: August 1, 2026. This document is the certification of hazard assessment required by 29 CFR 1910.132(d)(2).

Signature: [Adam: sign] Date: [Adam: date]

5.1 Where it lives

Signed original scanned into the app (Softr, with the NU-GOV-000 register); a copy in the prequal answer set so ISN/Avetta/Unify uploads never wait on a hunt. The office produces it on request in under a minute — that is the test.

5.2 When it gets re-done

Re-assess §4 and re-sign §5 whenever any of these happen — and once a year regardless, with the NU-SAF-100 §11 annual program review and signature refresh:

  1. A new task type — the Dirt Work Division's pool digs and any new service line get a row before the first crew mobilizes.
  2. New equipment class — a larger rig, a new attachment, anything that changes the hazard picture.
  3. An incident or near-miss that PPE touched — the NU-SAF-121 record triggers the review; the review answers "was the §4 row wrong, or was it not followed?"
  4. Annual review — new date, new signature. An assessment dated three ownership-of-hazards ago convinces nobody.

6. PROVISION, REPLACEMENT & PAYMENT (the rule that keeps PPE on bodies)


7. NU-SAF-102-C — PPE FIELD CARD (Tier 3 — print, laminate, truck)

THE FIVE, before the gate, every day (Card 05-A line 8): hard hat · hi-vis · safety glasses · safety-toe boots · gloves

ADD BEFORE THE TASK: 1. Pilot bore, on the controls → dielectric gloves + mat (NU-SAF-110 — inspected, air-tested, in test date). 2. Rig, hydrovac, missile, breaker, or saw running → hearing protection. 3. Cutting or grinding anything → face shield OVER the glasses. 4. Mud, pits, standing water → waders / rubber boots. 5. Fusion heater plate → heat-rated gloves. 6. Additives, solvents, fuel, pipe lube → chemical-resistant gloves + splash goggles when the SDS calls for them. 7. Night, above 45 mph, or flagging → Class 3 hi-vis (NU-SAF-105 §6.3).

Damaged PPE = swap it today, free, Truck Log Section C. Taped-up PPE is failed PPE.


8. PROOF & RECORDS (what has to exist when this is done right)

Every gate names its record. A gate that produces no record is a suggestion.

Record Who When Where it goes
Signed §5 certification (current date) Owner On issue + every §5.2 trigger + annually App + prequal answer set
PPE line on the JSA — task add-ons named for the day's work Crew Lead Before ground break, daily JSA form
Card 05-A morning gate (the five, on, before rolling) Crew Lead Every morning Card 05-A routine / ROLLING photo per NU-GOV-004
PPE swap (item, man, reason) Crew Lead Same day as the swap Daily Truck Log Section C
Dielectric glove daily test + 6-month retest dates Operator / Office Per NU-SAF-110 §10 JSA + app (NU-SAF-124 matrix when built)
New-hire PPE issue + sizing + training sign-off Office Day 1–2 window Training record / app (NU-SAF-124 when built)

Accountability tie-in (NU-PPL-403): PPE is already citable — Card 05-A line 8 makes the five part of the morning gate, and NU-SAF-105 §6.3 prices a vest miss at 1 point. Proposed rows, pending Adam ratifying into 403: any baseline-five item missing inside the cones = Class A (1 pt); working a §3 gated task without its add-on = Class B; the dielectric-glove and strike-protection misses stay Class B/C per the NU-SAF-110 §10 proposal (not duplicated here). Points land on the man who skipped it AND the Crew Lead who watched him work that way.


DONE WHEN


NEVER


9. WHAT THIS DOCUMENT NEEDS FROM ADAM

  1. Sign §5. This is the audit item — the single signature every prequal and every post-incident records request asks for by name. Two minutes, and it closes a P1 row on the NU-GOV-000 gap list.
  2. Decide the boot mechanism (§6): company-bought, allowance, or capped reimbursement. NU-SAF-100 already committed Nova to paying; this is only the how.
  3. Fill the spare-PPE stock per truck (§6): glasses, gloves, earplugs — quantities, and who restocks them on the supply run.
  4. Inventory check: face shields, muffs/plugs, heat-rated fusion gloves, chemical gloves, waders — on the trucks today, or on an order? [Adam: fill what exists]
  5. Ratify the §8 point rows into NU-PPL-403 so the enforcement column is 403 law, not this document's proposal.
  6. Dielectric glove class: already open as NU-SAF-110 §11 item 2 — closing it there completes this document's §4 row 1. Not a new item, just the same one, flagged twice on purpose.
  7. Sawcutting interim rule (§4 row 10): until NU-SAF-111 exists, decide the silica interim (who cuts, with what dust control). One sentence from you and the row stops being a gap.
  8. Ratify Card 05-A v1.0 (NU-GOV-006). Its line 8 wording is load-bearing in this document's §2 — any future change to that line revs this document.

NU-SAF-102 · Rev 1.0 DRAFT · Nova Underground · Parent: NU-SAF-100 §5 element 3 · Governing: 29 CFR 1926.95–.106 + 29 CFR 1910.132(d)(2) certification · Field-card layer: Card 05-A line 8 + NU-SAF-102-C · Uncontrolled when printed.

Nova Underground LLC · Internal use onlyNU-SAF-102 · Uncontrolled if printed
⌂ Back to the Library