NU-GOV-000 — NOVA SOP REGISTER & DOCUMENT CONTROL STANDARD
Version 0.3 · July 27, 2026 · Owner: Adam Pelewski · Supersedes Master SOP Index v0.2 (July 12, 2026)
This is the one page that says what documents exist, what number they carry, who owns them, and what is still missing. If it isn't on this page, it isn't a controlled Nova document.
PART 1 — WHY v0.3 EXISTS
v0.2 was an honest status board, and it worked: it named five half-builts and a build order, and three of them got built (008 points, 009 injury aftermath, 010 employee manual). But it had a structural problem that shows up the moment you try to put the system in an app:
The numbering was sequential, not linear. NU-OPS-001 through 011 were issued in the order they were written, so the number tells you when a document was made, not what it is. NU-OPS-006 is fleet. NU-OPS-007 is quality. NU-OPS-008 is discipline. There is no pattern. Add twenty safety SOPs to that and nobody — not a crew lead, not a GC auditor, not Steve building the app — can find anything without reading all of them.
And the topics you asked about are already written down — just not as documents. Trailer hookup, traffic control, and cone setup all exist today as fragments scattered across four different books:
| What you asked for | Where it actually lives right now |
|---|---|
| Connecting trailers to trucks | NU-OPS-002 Driver ch. (3 lines) · NU-OPS-006 Card 5 (1 line) · Field Quality CSV "Pintle hitch connect" (5 rows) · Equipment PM CSV (2 rows) |
| Traffic control setout | NU-OPS-007 Card 3 (a 4-row table, flagged "confirm against MUTCD") · NU-OPS-002 Crew Lead ch. · Field Quality CSV (4 rows) |
| Cones around vehicles | NU-OPS-008 Part 2 module 4 + truck loadout (20 cones) · a dozen scattered "never leave a hole without cones" lines |
| Safety generally | No safety program document exists. v0.2 called this "BIGGEST OPEN RISK" and it is still open. |
So the answer to "what SOPs do I need to create" is two answers: a numbering system that makes the library linear, and a specific list of missing documents — with the safety program at the top, because it is the only gap on the list that can shut the company down or lose a prequal.
PART 2 — THE NUMBERING STANDARD (this is what makes it linear)
This is how every underground contractor that survives an ISNetworld / Avetta / Congruex Unify audit organizes documents, and it is how the big utility primes (Dycom, MasTec, Congruex operating companies, Ervin Cable) do it internally. Numbers are blocked by function, not by date.
2.1 Document ID format
NU - SERIES - ###
| |
| └── number inside the series (leaves room to insert)
└── three-letter function block
| Block | Series | Covers | Owner role |
|---|---|---|---|
| 000–099 | GOV | Governance, authority, document control | Owner |
| 100–199 | SAF | Safety & health | Supervisor / Owner |
| 200–299 | FLD | Field operations — how the work gets built | Supervisor |
| 300–399 | FLT | Fleet, DOT, equipment | Supervisor |
| 400–499 | PPL | People — hire, train, pay, discipline | Owner / Office |
| 500–599 | FIN | Money — estimate, bill, collect | Owner / Office |
| 600–699 | QAL | Quality — acceptance standards | Supervisor |
| 700–799 | CMP | Compliance & client requirements | Office |
2.2 Document tiers (the other half of "linear")
Every document is exactly one of four things. Mixing tiers is what made the current books hard to hand off — NU-OPS-002 is a policy, a procedure, a work instruction, and a form all at once.
| Tier | What it is | Length | Lives where |
|---|---|---|---|
| 1 — Policy | What Nova commits to and who is accountable. Signed by the Owner. | 1–3 pages | Binder + prequal portals |
| 2 — Procedure (SOP) | How the company does it, step by step, with the gates named. | 2–6 pages | Binder + app |
| 3 — Field Card / Work Instruction | The laminated version a man does the work from. Steps only. | 1 page | Truck + app (mobile) |
| 4 — Form / Record | The proof it happened. Signed, dated, filed. | 1 page | App (this is what Softr holds) |
The rule that makes the app work: every Tier-2 gate becomes a required field on a Tier-4 record. If a step is a gate but produces no record, it is not a gate — it is a suggestion.
2.3 Transition rule — do NOT reprint the library
Existing documents keep their printed NU-OPS numbers. New documents get series numbers only. The register below carries both IDs on the same row, and in the app the register table gets a Doc ID field and a Legacy ID field. Documents pick up their series number the next time they rev anyway. Nobody re-signs anything, no cross-reference breaks, and the library is linear from today forward.
PART 3 — WHAT EXISTS TODAY (12 documents, all mapped)
| Doc ID | Legacy ID | Title | Tier | Rev | Status |
|---|---|---|---|---|---|
| NU-GOV-000 | Master SOP Index | SOP Register & Document Control | 1 | 0.3 | This page |
| NU-GOV-001 | NU-OPS-005 | Delegation of Authority | 1 | 1.0 | Issued |
| NU-GOV-004 | — | Daily Loop (comms cadence + standing rules + WhatsApp templates + Friday scorecard NU-GOV-004-F) | 1/3/4 | 1.0 | Issued 7/28/26 — checker named Dakota Haley 8/2/26 |
| NU-GOV-004-C | — | Pocket Cards — 3 cut-out cards (Crew Lead / Supervisor / Everyone). This is the daily-use doc; NU-GOV-004 is the reference behind it | 3 | 1.0 | Issued 7/28/26 |
| NU-GOV-005 | — | The Seat Plan — Field Ops Manager + Office/Billing Coordinator scorecards, comp structure, 90-day handover ladder, sellability scoreboard | 1 | 1.0 | Issued 7/28/26 — 5 decisions open on Adam (p.4) |
| NU-GOV-006 | — | The Nova Card Deck — 1-page process map + 13 field cards extracted from the approved library. The field's front door to the whole system | 3 | 1.0 | Issued 7/28/26 |
| NU-SAF-121 | NU-OPS-009 | Injury & Incident Aftermath | 2 | Draft | Draft — needs 300 log + root cause |
| NU-FLD-200 | NU-OPS-002 | Field Recipe Book (6 role chapters) | 2/3 | 1.3 | Issued |
| NU-FLT-300 | NU-OPS-006 | Equipment & Fleet Program | 2 | 1.0 | Issued — register still [fill] |
| NU-FLT-301 | NU-OPS-006-B | Truck Housekeeping Standard | 3 | 1.0 | Issued |
| NU-PPL-400 | NU-OPS-001 | Workforce Playbook | 2 | 1.1 | Issued |
| NU-PPL-401 | NU-OPS-003 | Hire-to-Trained Manual | 2 | 1.0 | Issued |
| NU-PPL-402 | NU-OPS-003-B | Offer & Payroll Pack | 2 | 1.0 | Issued |
| NU-PPL-403 | NU-OPS-008 | Accountability & Points System | 2 | 1.0 | Approved 7/23/26 |
| NU-PPL-404 | NU-OPS-010 | Employee Manual | 1 | 1.0 | Issued 9/1/26 (Adam waived the attorney gate; blanks resolved — holidays, call-off, PTO, reporting). Attorney review still advisable at next revision |
| NU-PPL-405 | NU-OPS-011 | First Day / Two-Day Training Protocol | 2 | 1.0 | Issued |
| NU-FIN-500 | NU-OPS-004 | Get Paid — The Money Loop | 2 | 1.0 | Issued |
| NU-QAL-600 | NU-OPS-007 | Field Quality Cards (8 gates) | 3 | 1.1 | Issued |
Built new with this register (July 27, 2026):
| Doc ID | Title | Tier | Status |
|---|---|---|---|
| NU-SAF-100 | Safety & Health Program | 1 | NEW — issued for Adam's signature |
| NU-SAF-105 | Work Zone Traffic Control & Cone Standard | 2/3 | NEW — supersedes NU-QAL-600 Card 3 |
| NU-FLT-310 | Trailer Hookup, Loading & Towing (includes load securement) | 2/3 | NEW — supersedes NU-FLT-300 Card 5 + the Pintle Hitch quality rows |
Added August 1, 2026 (numbers proposed — pending Adam's approval of QAL placement):
| Doc ID | Title | Tier | Status |
|---|---|---|---|
| NU-QAL-601 (proposed) | NOVA CERTIFICATIONS — Skill Tree program (interactive, v1.5) | 1/2 | Issued — 8 open decisions listed in-doc |
| NU-QAL-601-A (proposed) | Certification & Badge Cards — Tiers 1–3 + Badge Board (C2 Truck, C3 Trailer, C4 Mini-Ex, C5 Missile, C6 Prints + 6 badges; Fusion parked, Rod Handler removed per Adam 8/1/26) | 2/3 | Draft v1.1 — awaiting Adam approval |
| NU-FLD-220 (proposed) | The Bore Sequence — locate verify → pilot → ream → pullback, five gated phase cards; fills the "HDD / Bore Procedure SOP" slot reserved in Playbook §3; phases 0–2 reference existing docs, ream + pullback are new standard | 2/3 | Draft v1.0 (adversarially verified) — awaiting Adam approval; 6 open items in-doc |
| NU-GOV-007 (proposed) | The Nova System Map — the visual front door: five layers (training → skill tree → SOPs → run of day → app), full library statused, conversion queue; interactive GAME EDITION | 1 | Issued 8/1/26 — register remains the controlled list |
Added August 21, 2026:
| Doc ID | Title | Tier | Status |
|---|---|---|---|
| NU-FLD-210 | Work Order & Start the Day — WO built the day before (Dakota): who/what/where/directions/expected production + materials/equipment/tools checkbox lists; warehouse gates (360 truck/trailer photos, dash DEF+fuel photo) before rolling; arrival photos + locates GO/NO-GO; hourly photos to CRM; end-day photos + report into the Nova app. Fills the "margin gate #1 / BUILD NEXT" slot from §4.3. Source: Raj mastermind 8/21/26 whiteboard | 2/3 | DRAFT v0.1 — awaiting Adam approval; 3 open items in-doc |
| NU-FLD-210-F | Work Order (print pad) — one-page paper form for the paper-parallel period until the Softr build lands: WO header (who/what/where/expected/on-app?), materials/equipment/tools boxes with initials+time, warehouse photo gates + ROLLING, arrival/locates GO-NO-GO, hourly tick row, end-of-day report + Dakota check. Companion: "TEXT TO DAKOTA (paste-ready).txt" | 4 | Issued 8/22/26 (paper-parallel) |
Added August 2, 2026:
| Doc ID | Title | Tier | Status |
|---|---|---|---|
| NU-GOV-008 (proposed) | The Daily Rhythm Index — one-page router: Open (Card 05-A front) → Mid-day (Card 05-A back + Recipe Book if-thens) → Close (Truck Log Section B + Daily Loop 7:00/7:30 PM). Points at the three existing docs, adds no new steps. Flags mid-day as the thinnest window (lunch strip only, no dedicated card) as an honest open item, not a gap papered over. | 3 | Issued 8/2/26 |
PART 4 — THE GAP LIST (what still needs to be created)
Priority key: P1 = costs money, shuts a crew down, or loses a client if it stays missing. P2 = build this quarter. P3 = build when the P1s and P2s run clean.
4.1 SAFETY (NU-SAF-100 series) — the biggest hole in the library
Nova has if/then cards and a damage report. It does not have a written safety program. That is not a paperwork problem, it is three real problems: (a) every serious prequal — Congruex Unify, ISNetworld, Avetta, and most GC packages — asks for the written program by name and by element; (b) the insurance underwriter prices the renewal off it; (c) after an incident, the first thing requested is the written program, the training records, and the toolbox talks. NU-SAF-100 (built today) is the umbrella. These are the elements that hang under it.
| Doc ID | Title | P | Why it's on the list |
|---|---|---|---|
| NU-SAF-100 | Safety & Health Program (umbrella policy) | P1 | BUILT TODAY |
| NU-SAF-101 | Hazard Communication + SDS | P1 | Drilling fluid, bentonite, fuel, solvents. Written program + SDS access is the single most commonly cited gap on small utility contractors. |
| NU-SAF-102 | PPE Program + written hazard assessment | P1 | The written certification of the hazard assessment is what auditors ask for, and it does not exist. |
| NU-SAF-103 | JSA / Pre-Task Planning procedure | P1 | The JSA form exists inside SOP 3. The procedure — who writes it, when it gets re-done, what triggers a new one — does not. |
| NU-SAF-104 | Toolbox Talk program + 52-week schedule | P1 | Cheapest safety documentation that exists and Nova has none. Weekly signed sheets are the record every audit opens with. |
| NU-SAF-105 | Work Zone Traffic Control & Cone Standard | P1 | BUILT TODAY |
| NU-SAF-106 | Flagger operations & certification | P1 | 105 says "no flaggers = we don't take the lane." Who is a certified flagger, and where is the card? No answer today. |
| NU-SAF-107 | Excavation & Trenching (OSHA Subpart P) | P1 | The most dangerous gap on this page. Pits, vaults, and now pool digs 8–10 ft deep in cobble. Subpart P requires a designated competent person, a daily documented inspection, a protective system at 5 ft, spoil setback, and egress within 25 ft. None of that is written and no competent person is formally designated. A trench collapse with no program is a willful-citation conversation. |
| NU-SAF-108 | Damage prevention & tolerance zone | P2 | Strong coverage already in NU-FLD-200 ch. 4 — needs pulling into a standalone doc for prequal packages. |
| NU-SAF-109 | Confined space (vaults, manholes, handholes) | P1 | Handholes and vaults are permit-required confined spaces once a man's body enters. No program, no entry permit, no attendant rule, no gas meter procedure. |
| NU-SAF-110 | Electrical safety + HDD strike protocol | P1 | Step potential kills the guy who walks away from an energized rig. The one thing the crew must know cold — "stay on the machine" — is not written anywhere. |
| NU-SAF-111 | Silica (1926.1153) | P2 | Sawcutting and coring concrete/asphalt puts Nova squarely in Table 1. Needs the control method per task written down. |
| NU-SAF-112 | Heat illness prevention | P1 (seasonal) | Georgia summer, and OSHA's heat National Emphasis Program is actively inspecting construction. Water/rest/shade schedule + acclimatization for new hires. |
| NU-SAF-113 | Hearing conservation | P3 | Rigs and saws. Program triggers on exposure monitoring. |
| NU-SAF-114 | Respiratory protection | P3 | Only triggers if 111 or 109 requires it. |
| NU-SAF-115 | Fire prevention, extinguishers, hot work | P2 | Extinguisher is already in the truck loadout; inspection tags and the hot-work rule are not. |
| NU-SAF-116 | Mobile equipment, spotters & backing | P1 | Struck-by is the #1 killer in utility construction and the #1 backing-incident source. "Nobody behind you" is one line in a driver chapter today. |
| NU-SAF-117 | Rigging & material handling | P2 | Reels, rod boxes, machine loading. Overlaps NU-FLT-311. |
| NU-SAF-118 | Fall protection (limited scope) | P3 | Truck decks, trench boxes. Narrow but asked for on prequals. |
| NU-SAF-119 | Emergency Action Plan + site-specific emergency info | P1 | Nearest ER per work order. Today nobody knows the hospital until somebody is bleeding. Cheap to fix — one field on the WO. |
| NU-SAF-120 | Drug & alcohol program (DOT + non-DOT) | P1 | If any truck/trailer combo is over 10,001 lb GVWR, DOT testing rules apply and the consortium/random pool is mandatory. Zero-tolerance is already in NU-PPL-403 with no testing program behind it. |
| NU-SAF-121 | Injury & Incident Aftermath | P1 | Exists as a draft (NU-OPS-009). Needs root-cause step + the OSHA 300 tie-in to go final. |
| NU-SAF-122 | OSHA recordkeeping (300 / 300A / 301) | P1 | 300A must be posted Feb 1 – Apr 30. No 300 log exists. Flagged since 7/23 and still open. |
| NU-SAF-123 | Subcontractor safety requirements | P2 | Nova is becoming a prime on dirt work. Whoever Nova hires becomes Nova's exposure. |
| NU-SAF-124 | Safety training matrix & qualification | P1 | Congruex already demands per-employee OSHA-10/30 + CPR/First Aid. There is no matrix showing who has what and when it expires. This is a table, not a document — and it belongs in Softr on day one. |
| NU-SAF-125 | Stop Work Authority | P2 | Short, and it changes culture more than any other page. Folded into NU-SAF-100 §4 today; standalone card later. |
| NU-SAF-126 | Inclement weather & lightning | P2 | 30/30 rule. Cheap. |
| NU-SAF-127 | Bloodborne pathogens | P3 | Triggers because trained first-aid responders are expected to respond. |
4.2 FLEET & DOT (NU-FLT-300 series)
| Doc ID | Title | P | Why |
|---|---|---|---|
| NU-FLT-310 | Trailer Hookup, Loading & Towing (incl. load securement) | P1 | BUILT TODAY — kept as one document because in the field it is one linear sequence: hook, load, strap, walk it, go |
| NU-FLT-312 | DVIR procedure (pre/post trip) | P1 | Referenced everywhere, written nowhere. FMCSA requires the written post-trip DVIR and the repair certification. |
| NU-FLT-313 | Driver Qualification files (FMCSA Part 391) | P1 | Open compliance exposure. With 7 trucks pulling equipment trailers, Nova is almost certainly a motor carrier. That means a DQ file per driver: application, MVR at hire + annually, medical certificate, road test or CDL equivalency, annual review, violation certification. If Nova has a DOT number and no DQ files, a roadside inspection or a single accident opens the whole file. Verify carrier status before anything else on this list. |
| NU-FLT-314 | Hours of Service / 150-air-mile short-haul records | P2 | The short-haul exemption is usually the right answer, but it has conditions and it has to be documented. |
| NU-FLT-315 | Accident procedure + post-accident testing | P1 | Ties to NU-SAF-120 and NU-SAF-121. |
| NU-FLT-316 | Oversize / overweight permits & routing | P2 | Moving rigs on GA roads. Width, height, and bridge law. |
| NU-FLT-317 | Fuel card control & reconciliation | P2 | Direct margin leak, no controls today. |
4.3 FIELD OPERATIONS (NU-FLD-200 series)
| Doc ID | Title | P | Why |
|---|---|---|---|
| NU-FLD-210 | Work Order creation | P1 | Called "BUILD NEXT" in v0.2 and still not built. Margin gate #1 — won bid → numbered WO with a unit budget. Every cost report downstream is guessing until this exists. |
| NU-FLD-211 | Weekly look-ahead scheduling | P2 | Nightly post is solid; there is no week. |
| NU-FLD-212 | Drilling fluid management, spoils & frac-out response | P1 | A frac-out into a creek is a GA EPD problem, not a cleanup problem. Nothing written. |
| NU-FLD-213 | Hydrovac / potholing operations | P2 | New revenue line being sold now with no written procedure. |
| NU-FLD-214 | Excavation & dirt work operations (Dirt Work Division) | P1 | Pool digs are being quoted. Pairs with NU-SAF-107. |
| NU-FLD-215 | Restoration & permit close-out | P2 | Covered thin in cards; permits are where retainage dies. |
| NU-FLD-216 | As-built / redline capture | P2 | v0.2 called it "covered, thin." Still thin. |
| NU-FLD-217 | FDH / cabinet & fiber standard | P2 | Drafting since v0.2. |
4.4 GOVERNANCE, MONEY, QUALITY, COMPLIANCE
| Doc ID | Title | P | Why |
|---|---|---|---|
| NU-GOV-002 | Document control & revision procedure | P2 | Who can rev a doc, how versions retire, where the master lives. Half of it is Part 2 of this page. |
| NU-GOV-003 | Access & account control | P1 | Register exists, two CRITICAL rows still open since 7/18. |
| NU-CMP-700 | Client compliance calendar | P2 | A COI lapse nearly cost Lumos site access. One diary, one owner. |
| NU-CMP-701 | Prequal portal management (ISN / Avetta / Unify / Veriforce) | P2 | Each portal wants the same 20 documents. Build the answer set once. |
| NU-CMP-702 | Subcontractor management (COI diary, lien waivers, sub DFRs) | P2 | Flagged in v0.2, not started. |
| NU-FIN-510 | Estimating & takeoff procedure | P2 | Done ad-hoc per bid. |
| NU-FIN-511 | Contract / SOW review checklist | P1 | NU-GOV-001 says who signs. Nothing says what to read for. LDs, retainage, no-damage-for-delay, rock clauses — every one of those has already bitten. |
| NU-QAL-610 | Nonconformance & rework | P3 |
PART 5 — BUILD ORDER (do not boil the ocean)
Done today (4 documents): NU-GOV-000 register · NU-SAF-100 safety program · NU-SAF-105 traffic control & cones · NU-FLT-310/311 trailer & securement.
Next five, in this order — and each one is a week, not a month:
- NU-FLT-313 — verify DOT carrier status, then build DQ files. Not a writing job, a fact-finding job. One phone call answers whether Nova is a motor carrier. If yes, the DQ files are overdue today.
- NU-SAF-107 — Excavation & Trenching + designate the competent person by name. Pool digs start soon. This is the one gap that can kill somebody.
- NU-FLD-210 — Work Order creation. Margin gate #1. Everything financial downstream is blind without it.
- NU-SAF-104 + NU-SAF-124 — toolbox talks + training matrix. Both are tables, both go straight into Softr, both are what every prequal and every insurance renewal asks for.
- NU-SAF-101/102/119/122 — the paperwork four (HazCom, PPE assessment, EAP, OSHA 300). A day's work together, and they close most of the remaining prequal checklist.
Still open from v0.2 and not yet closed: name the timekeeping app · fill the Fleet Register (still all [fill]) · close the two CRITICAL access rows · confirm GA lien deadlines with counsel · get cost data into the production log.
PART 6 — WHAT THIS REGISTER NEEDS FROM ADAM
- Approve the numbering standard in Part 2 (series blocks + dual-ID transition). Once approved it never changes again.
- Answer the DOT question: does Nova have a USDOT number, and what is the GVWR/GCWR of the truck-and-trailer combos? This decides whether NU-FLT-313/314/315 and NU-SAF-120 are urgent or optional.
- Name the competent person for excavation (Subpart P requires a designation by name, with the authority to stop work and remove men from a trench).
- Sign NU-SAF-100. A safety policy is worth nothing unsigned — that signature is literally the first page of every prequal.
- Confirm the cone/sign counts in NU-SAF-105 §7 against what is actually on the trucks today.
NU-GOV-000 · Nova Underground · v0.3 · July 27, 2026 · Supersedes Master SOP Index v0.2 · Update this page whenever any document is created or revised · Uncontrolled when printed.